Log of hours updating www.PetersonLandscape.com
I think the last job you did for us was installing the stone blocks as steps on the south side of the house. Before that you had built the foundation for the outside shed on the north side of the house. What do your records show?
All caught up as of 2010 – starting anew in 2011
Running Total (hours) Date – Activity
2011-12
02.75 (02.75) 11/28-30/11 – format blog, add link to menu on main site, create new water rollover
03.75 (1.00) 4/16/12 – fix contact form.
4.00 (0.25) 4/19/12 -fix contact form template
5.50 (1.50) 4/23/2012 – recreate new contact form and add new pic to rotation
2013
06.00 (0.50) 5/15/13 – recreate resource page, links
06.25 (0.25) 5/23/13 – add more resources, links
07.75 (1.50) – Fix rotating images on home page
2014
11.50 (3.75) -Install WordPress themes, create pages, adjust css, photos
16.00 (4.50) -Create new theme for responsive layout, galleries, pages, content, plugins, meeting with Colleen who has input many photos to media library
2015
18.00 (2.00) -Meeting with Colleen to work out bugs, add content to Porfolio and Services page
21.25 (3.25) 4/22/15 -Uploaded mobile pics, adjusted fonts, home slider, logo, photo text
22.25 (1.00) October 2015 – Create backups of content and databases, (attempt first migration of WP site – failed, spent 6 hours with Peak trying to sort it out)
26.00 (3.75) 11/17/15- Successful migration of WP website. Update media links, create child theme, adjust css files, recreate slide show on home page, fix login and footer text.
26.75 (0.75) 1/11/16- Fix contact form, add new field
28.25 (1.50) 1/14/16- Give Bill a lesson on editing in WordPress
29.50 (2.75) 1/14/16- Add favicon, create new pages, upload new photos
2017 Colleen was webmaster
2018
33.75 (4.25) 4/18/18 fixed portfolio page links, uploaded new photo plugin, recreated galleries for portfolio pages – patios/decks and plantings/lawns
2019
34.75 (1.00) 1/23/19 uploaded new photos for rotation, Patio and Outdoor Room pages. Edited Contact page. Researched SSL certificate.
37.75 (3.00) 1/27/19 cleaned up all portfolio pages, set featured images, uploaded resized photos.
40.25 (2.50) 1/30/19 deleted/imported/resized multiple images for portfolio pages
42.00 (1.75) 1/31/19 deleted/imported/resized multiple images for portfolio pages and home slider
April 2019 _______________________________ zeroed out – stair project at 1755
2020-22
2.00 website updates, new manager logins, peak email and SSL issues, theme and plugin updates